logo ferbaq
Construction

Section 1 and 5 of the Mayan Train Railway Infrastructure

Duration: 2022 - PRESENT
Location: Yucatan, Quintana Roo & Campeche

Value Added

Integration of Specific Brands for the Sector and Type of Project under development focused on Service, Technical, Commercial and Logistic Support.

Highlighted in:

Supply of polyconduit for power lines.

Disciplines with which we participate in this project:

  • Civilian consumables
  • Welding and consumables
  • Personal Protective Equipment (PPE)
  • Lifting and Loading
  • Cutting and Roughing
  • Special Hand and Power Tools
  • Adhesives and waterproofing agents
  • Pluvial gratings and accessories

Related Projects

Quiero Postularme:
Encino gas pipeline

Chihuahua

PROJECTS

Cancun

Centralia Business Park and Plaza 301, D-21 Cancun, (Cancun International), Benito Juárez, Quintana Roo, C.P. 77569, Mexico

Tlalnepantla

L. M. Ericsson 3, Bodega 15 PB Edificio 4, La Loma, Tlalnepantla de Baz, Méx. C.P. 54060

Tabasco

Lerdo De Tejada 416 Paraiso, Paraiso Center, Tabasco, 86605 Mexico

Salina Cruz

Tuxpan 111, 3 Las Hormigas Salina Cruz, Oaxaca 70670 México

Tijuana

Carr. Lib. Tijuana, Tecate 22150 El Realito, Tijuana, Baja California 22250 Mexico
We use our own and third-party cookies to optimize our website and services. Check our Privacy Notice for more information.
Puerto Libertad Photovoltaic Park ferbaq

Sonora

PROJECTS

Bonatti oil terminals ferbaq

Sinaloa

PROJECTS

MEXICALI

Residencial segovia, C. Canalejas 665, 21376 Mexicali, B.C. Mexico.

Los Ramones gas pipeline

Nuevo León

PROJECTS

Tula Hidalgo Refinery

Hidalgo

PROJECTS

Aifa

State of Mexico

PROJECTS

Salina Cruz Oaxaca Refinery

Oaxaca

PROJECTS

Dos Bocas Refinery Ferbaq

Tabasco

PROJECTS

Mayan Train Ferbaq

Yucatan, QUINTANA ROO AND CAMPECHE

PROJECTS

Quintana Roo

PROJECTS